Case
Classification
Zhejiang hai li de new material limited by share ltd
The annual output of 200,000 tons of functional polyester project is steel structure engineering of outdoor pipe rack, steel structure engineering of dipping workshop and steel structure engineering of weaving workshop.
Cambodian pacific home fashion co.,ltd
1# workshop steel structure project, location: Hang Ping Shen Road west side, Hai Guang Road south side. The total building area reaches 42073.87 square meters.
Zhejiang martian kitchenware limited by share ltd
New B1, B2, B3 workshop.
Songcheng performing arts
The project is located at the intersection of Expo Avenue and Changqing North Road in Pudong New Area, Shanghai. The total building area is about 41500 square meters. The scope of steel structure of this project is divided into two parts: steel structure of stage A and steel structure of continuous casting workshop B.
Previous page
1
Next page
Hongxiang Steel Structure can always implement the concept of “winning customers with integrity, and building dreams with innovation”, to lead all the soldiers of Hongxiang Steel Structure to create a better future.
Contact
Add:
Headquarters address: 12th Floor, Ruifeng Building, No. 31 Fengshou West Road, Maqiao Jingbian Park, Haining City, Zhejiang Province
Tel:
Email:
Quick links
Copyright © Zhejiang Hongxiang Steel Structure Co., Ltd. 浙ICP备20015505号 Power:300.cn