The building area is 180014.84 square meters. The construction will start in March 2021 and will be completed in July 2021.
New factory buildings B1, B2 and B3 were built.
Jiaxing Fusda Gas Equipment Co., Ltd.'s green intelligent manufacturing project with an annual output of 10 sets of large-scale modular deep-cold chemical equipment has a total construction area of 42,773.62 square meters. The project is located in Haiyan County, Jiaxing City, Zhejiang Province. The total steel structure is 6,100 tons, the building height is 33 meters, the maximum span is 40 meters, and it is equipped with a 250-ton crane.
Won the "China Steel Structure Gold Award" in 2022, the building covers an area of 48,801.46 square meters (including a canopy area of 3,717.71 square meters), a total construction area of 93,885.21 square meters (including a canopy area of 3,717.71 square meters), a building height of 13,700 meters, and a two-story steel structure.
Workshop steel structure project, project location: west side of Hangpingshen Channel and south side of Haiguang Road. Full steel structure with a construction area of 42073.87 square meters.